TADANO Hydraulic Truck Cranes TG1500E (150ton) in service

 

 

 

 

Closely coordinate the decoration of exhibition in China (Zhuhai).

 

 

 

IHI Crawler Cranes 80ton, 100ton, 150ton, 200ton in service on this important project

 

 

 

As provide the major lifting and foundations equipment for a total of approximately 1,000 Nos. of bore piles foundations work at the Mass Transit Railway Corporation, Hong Kong - The Kowloon Station Project.

 

 

 

 

Tone Japan Mach Drill System,Unique Reverse Circulation Down the Hole Method for 2.0m Dia pile Recorded Drilling Speed over 1.0m Per Hr in Fresh Granite for Motion

 

 

 

 

20 Nos. rock socketed large diameter bore piles were required to be constructed to 35 meters depth in Grade III / II granite rock having a socket length of between 6 meters and 13 meters with an average length of 10 meters. The drill work commenced in November 99 and by mid- December the 200 meters of rock socketing work was completed at drilling procress of between 0.9 and 1.5 meters per hour.

 

 

Address : Room 1801-2, 18/F,

21-24 Connaught Road West, Hong Kong

Tel : (852) 2544 - 8821

Fax : (852) 2544 - 2866

E-mail : info@houstonhk.com

Web Site : http://www.houstonhk.com/

best viewed at 1024x768 pixels

 

flash plug-in required